When Earth Speaks: Soil Voices

Soil Voices

Soil Voices:  a 24 hour live – stream performance

I lay in a pre- prepared self – dug 2ft ditch on the plateau managed by Pwllpeiran Upland Research Centre, known as the Ffridd (the upland fringe) at 600m approx. On the hour, every hour, over 24 hours, I attempted to vocalise the live and continuous numerical data stream from a newly installed sensor network. I received the data from the 12 agri -sensors through headphones via a specially built ‘talkie box’ connected to a computer processor. The data stream emitted from the soil sensors embedded in the ground around where I lay each communicated the soil moisture and soil temperature readings every fifteen minutes. Due to the firewire port in the ‘talkie box’ breaking I was no longer able to receive the data stream, so unfortunately the performance was cut short at 04.20am, rendering the performance 13 hours instead of 24.

Local and global audiences were invited to drop in an out of the 24 hour live- stream, in the hope that by being virtually up close and in the mountain with the soil and me for a few seconds or hours might generate a greater awareness and new perspectives – not only of the nuanced and fluctuating soil conditions, but of human and non-human entanglement, human and non – human interconnectedness, from an ecofeminist perspective.

Photos by Colin Davidson, Vane Gallery, 2024

Links to the full live-streams:

15.00pm
16.00pm
18.00pm
19.00pm
20.00pm
21.00pm
22.00pm
23.00pm
24.00pm
01.00am
02.00am
03.00am
04.00am

Press:

Aber News the triennial Aberystwyth University magazine

Wales Online:

https://www.walesonline.co.uk/news/wales-news/woman-lying-self-dug-ditch-27511269

BBC Wales News Online:

https://www.bbc.co.uk/news/uk-wales-66484655?fbclid=IwAR1U0ve408KhFYddTKxbRlRmKOa45WovnWMJFXyWiP3r25cCn73wogt1JV8

BBC Radio Wales: Breakfast with Oliver Hides

https://www.bbc.co.uk/sounds/play/m001pk9l?partner=uk.co.bbc&origin=share-mobile&fbclid=IwAR0zY_FIEJu8owwpOfmY5pRJoE96uIzZc_jMAWwx3Ufc64b6N3g2bZd_NXg

The preparation

Day 1 – Digging the ditch

Day 2 – More digging…

Day 3 – Digging deeper..going in..

Day 4 – Driving the Land Rover, more digging, and moving the earth pile..

Day 5 – The Rehearsal..